Repair Ball Mill Discharge Trunnion Crack
Initially the mill was jacked-up to remove the weight of the mill and the charge from the trunnion. The sections in the upper half of the trunnion that either exhibited cracking or were less than 1.905cm (.75″) thick were removed. There were four (4) excavations required in the upper half with approximate sizes of 16.193cm (6.375″) x 28 ...
قرأ أكثر